The company tunnelling for the North East Link has taken control of the Heidelberg site, conceding its machines could be responsible for the sinkhole.
Tunnelling on North East Link paused after 7.5-metre sinkhole appears
Published 3 days ago
Source: smh.com.au
Categories
National / Victoria
Related Articles from smh.com.au
17 minutes ago
‘There’s barely a blade of grass’: A family-owned winery gone within an hour
21 minutes ago
United Cup 2026 LIVE: De Minaur takes to the court in must-win match against Hurkacz
22 minutes ago
Victoria bushfires LIVE: Longwood fire destroys homes in Ruffy; warnings for towns including Alexandra, Yea and Skipton; widespread power outages amid heatwave temperatures
32 minutes ago
Magpies star Bobby Hill granted leave of absence from the club
38 minutes ago
Heatwave Hayley? It’s time to name these ‘supercharged’ weather events
38 minutes ago