In the heart of Algeria’s Sahara Desert, Chinese state-owned giant China Railway Construction Corporation (CRCC) has completed laying track on the PK330 Bridge, a final and critical link in a new railway designed to unlock the nation’s mineral wealth.
The 6km (3.7-mile) bridge is part of the 950km railway linking the Gara Djebilet iron ore deposit in southwestern Tindouf province to the industrial hub of Bechar in the northeast.
It was the “most technically demanding railway engineering feat...
How Algeria could help China plug iron ore gaps and gain pricing power
Published 3 hours ago
Source: scmp.com

Related Articles from scmp.com
1 hour ago
Hong Kong finance chief upbeat about 2026 outlook on back of 3.2% growth
1 hour ago
Brigitte Bardot, French icon and animal rights activist, dies at 91
1 hour ago
Why Saudi Arabia might not fulfil spending pledge to US amid China-America rivalry
1 hour ago
China paralysed man, who can only move a finger and a toe, creates smart farm system, start-up
2 hours ago
650 Hongkongers on Taiwan group tours confirmed safe after ‘terrifying’ quake
2 hours ago